−100 now, 110 in a year
IRR = 10%
110/(1 + r) = 100.
The internal rate of return is the discount rate that makes the net present value zero: . A project is attractive if its IRR exceeds the required rate of return.
This page is easier if you are comfortable with:
Cash flows : we need , i.e. , which gives IRR (check: ). For now and in a year, IRR . For : , so , IRR .
The equation is a polynomial in , generally solved numerically (bisection, the secant method, Newton–Raphson). Projects with alternating signs of cash flows can have several IRRs, or none, so NPV is the safer criterion (net present value). For a loan the IRR of the borrower's flows is the true cost of borrowing (loan repayment).
For two cash flows the IRR is (the effective annual rate type growth rate); the annuity case needs the annuity factor. The same root-finding idea gives the yield of a bond (bond price).
The IRR is the discount rate at which an investment exactly breaks even.
The root of the curve is the internal rate of return.
These examples are worked by hand, step by step, so you can compare your own working.
Find the IRR of −100 now and 110 in a year.
Find the IRR of −1000, 0, 1210.
Check that IRR ≈ 23.38% gives NPV ≈ 0 for −1000, 500, 500, 500.
A few situations come up again and again. Knowing them saves time and helps you spot answers that cannot be right.
IRR = 10%
110/(1 + r) = 100.
IRR ≈ 13.07%
NPV = 0 at r = 0.1307.
41.32 > 0
IRR above 10%.
−24.57 < 0
IRR below 15%.
The internal rate of return is the discount rate r at which NPV = 0. Accept a project if IRR exceeds the required return. It is usually found by interpolation or root-finding.
−100 now, +110 in a year. Find the IRR.
For −1000, 600, 600 find NPV at 10% and 15%.
Linearly interpolate the IRR between 10% and 15%.
Check NPV at r = 0.1307.
mean of returns ✗
solve NPV = 0 ✓
IRR accounts for timing.
one IRR ✗
may be several or none ✓
Multiple IRRs possible.
highest IRR always best ✗
size matters; use NPV ✓
Scale differs.
interpolation gives the IRR ✗
it is an estimate ✓
NPV is convex in r.
Try each one on paper, then open the answer. Use the solver above to see the full working.
10
20
41.32
-24.57
0.86
-12
Unlimited fresh questions with instant marking. Choose a level, work it out on paper, then type your answer.
Solve: …
The rate making NPV zero.
Solve NPV(r) = 0 numerically.
When IRR exceeds the required return.
Yes, if flows change sign repeatedly.
net present value.
secant method.
More in Finance and actuarial maths and the formula sheets.